AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |
Back to Blog
Civil engineer air force11/14/2023 ![]() ![]() ![]() He has commanded at the squadron, group, and wing levels. Kale entered the Air Force in 1995 as a distinguished graduate of the Reserve Officer Training Corps at Pennsylvania State University. He also directly oversees execution of the $3.4 billion annual operations budget, delivery of the $3 billion annual Military Construction Program, and $13 billion military housing portfolio.īrig. The unit conducts its operations at more than 72 locations worldwide. AFCEC missions include facility investment planning, design and construction, operations support, real property management and oversight, energy support, environmental compliance and restoration, and readiness and emergency management. As AFCEC commander, he leads a 2,200-person organization, responsible for providing responsive, flexible, full-spectrum installation engineering services. Kale III, PE, PMP is the Commander, Air Force Civil Engineer Center, Air Force Installation and Mission Support Center, Air Force Materiel Command, Joint Base San Antonio-Lackland, Texas. Groundwater Plume Maps & Information 2010.Final 5 Year Review Joint Base Cape Cod (JBCC) Superfund Site, Otis Air National Guard Base, MA, Sep 2018.2021 Annual Groundwater Plume Summary Letter Reports.Agency for Toxic Substances and Disease Registry PFAS information.Technical Fact Sheet – Perfluorooctane Sulfonate (PFOS) and Perfluorooctanoic Acid (PFOA) November 2017.MassDPH PFAS Fact Sheet, Frequently Asked Questions.Air Force's PFOS/PFOA Frequently Asked Questions.Technical Fact Sheet – 1,4-Dioxane, November 2017.Understanding the Link Between Exposure and Risk.JBCC Groundwater Plume and Land Use Controls Map.Cape Cod Land Use Changes Over Time (Courtesy of the Woodwell Climate Research Center, formerly Woods Hole Research Center).Restoration Advisory Board Guidelines, Joint Base Cape Cod,.Introduction to the Missions Response Site Prioritization Protocol (MRSPP).Impact Area Groundwater Study Program Update.JBCCCT Paid Ad for 12 April 2023 Meeting.Largest Historical vs Current (March 2023) Groundwater Plumes. ![]() Phone: (508) 968-4678, x2 Fax: (508) Joint Base Cape Cod Groundwater Plume Map and IRP and IAGWSP LUC Areas, issued April 2023 In addition, the IRP conducts extensive reviews to identify and test private wells in the vicinity of the plumes. The program continually looks at ways to optimize system operations and cleanup actions, and will be working with state and federal regulators to determine when cleanup efforts are complete and systems can be shut down.Īs part of its cleanup efforts, the IRP has replaced impacted drinking water supplies located off base and connected over 1,300 homes in the area of groundwaterplumes to municipal water. AFCEC owns and operates three 1.5 megawatt wind turbines that offset 100% of the power used by the treatment systems. There are nine IRP treatment systems currently treating approximately nine million gallons of groundwater per day and those systems and the groundwater in the area of each plume are regularly monitored to verify that cleanup goals are being achieved. Several potential source areas are being investigated under the Military Munitions Response Program and for emerging contaminants which were recently added to the AFCEC program.ĪFCEC is addressing 18 groundwater plumes, four of which have been cleaned up as the contamination is now below applicable standards. Sixty-one source areas have been delisted as Superfund sites. Many of those locations were confirmed as source areas that contributed to soil and/or groundwater contamination at some point in the past and over 70 have been cleaned up. There are over 100 locations on JBCC that have beenevaluated as part of the Air Force cleanup efforts. Interim treatment systems were used to begin addressing many of the groundwater plumes while final decisions on how to address the contamination were ongoing. The base was listed on the Superfund National Priorities List in 1989.The Air Force Civil Engineer Center (AFCEC) assumed managerial control from the Air National Guard in 1996. The Installation Restoration Program (IRP) began in the early 1980’s investigating and then cleaning up source areas and groundwater contamination at Joint Base Cape Cod (JBCC). ![]()
0 Comments
Read More
Leave a Reply. |